ToriSet
Fire extinguishers

ANAF Fire Protection PS6-HH

Estintore portatile a polvere ANAF da 6 kg, serie HH ad alta pressurizzazione. Caratteristiche — tipo: polvere; capacita: 6 kg.

Manuals

1

Manuale di Manutenzione PS6-HH

PDF · 846 KB

Available init
itItalian

Manuals remain the property of their respective manufacturers and are published to let product owners carry out maintenance correctly. Official manufacturers can request their removal at any time, using “Request removal” at the bottom of this page.

The manuals on this page stay online for at least 15 years. How we guarantee permanence

AI assistant

Questions about this product?

Ask what is in the manuals, how often the maintenance is due and what it takes to do it.

What it already has at hand

  • 1 manual, 1 language
  • 7 planned checks, the most frequent every month since the last inspection

Planned checks

Checks by country

Some checks are only mandatory in certain countries: pick yours and the list follows.

  1. 01

    Six-monthly check

    Periodic check of the extinguisher's efficiency and state of preservation: pressure, integrity of the tank and of the hose, accessibility, signage and update of the maintenance tag.

    every 6 months since the last inspectionUNI 9994-1:2024Italy only
  2. 02

    Scheduled overhaul

    Overhaul with internal inspection of the tank and replacement of the extinguishing agent. Cadence required for powder extinguishers: 60 months.

    every 60 months since the last jobUNI 9994-1:2024Italy only
  3. 03

    Tank pressure test

    Stability test of the tank with a hydraulic pressure test and replacement of the safety devices. Cadence required: 120 months.

    every 120 months since the last jobUNI 9994-1:2024Italy only
  4. 04

    Surveillance under the internal plan

    Visual check of the extinguisher: present in its assigned position, accessible, seals intact and pressure gauge in the green range. The standard does not set a fixed cadence: it requires a surveillance plan defined by the person responsible for the activity on the basis of risk. The monthly cadence proposed here is a starting value, to be adapted to the internal plan.

    every month since the last inspectionUNI 9994-1:2024Italy only

Manufacturer

Something not right on this page?

Help us keep it accurate: every report is read by a person.